Matter 3 (Murray-Darling Basin Authority): errata
URL: https://www.mdba.gov.au/sites/default/files/publications/matter-3-mdba-errata.pdf
Project: Basin Plan 5 yearly schedule 12 reports 2024
Authors: Murray–Darling Basin Authority
The Murray–Darling Basin Authority (MDBA) Matter 3 report was partly based on draft research and analytical work that was subsequently refined through a quality assurance process – these refinements are detailed in the Matter 3 errata.
The MDBA and other Basin governments are required to report every 5 years on a number of matters under Schedule 12 of the Basin Plan. These are statutory obligations and will provide information necessary to evaluate the effectiveness of the Basin Plan against its objectives and outcomes. These reports will inform the 2025 evaluation of the Basin Plan, with a line of sight to the Basin Plan Review in 2026. This report focuses on the MDBA’s 5-yearly reporting on Matter 3: ‘the extent to which the Basin Plan has affected social, economic and environmental outcomes in the Basin’.
You can copy and paste the embed code into a CMS or blog software that supports raw HTML